Tiza Group

Home / Guides / Grid, regulation and connection / Electric mobility

Electric mobility

Grid, regulation and connection

BTEV Charging Modes 1, 2, 3 and 4 ExplainedWhat EV charging modes 1, 2, 3 and 4 mean under IEC 61851-1: where protection sits, who talks to the vehicle, and when each mode is used on AC and DC.BTEV Charging Station Protection: Layers and TestsProtection of an EV charging station: overcurrent, short circuit, residual current, surge protection and the safety functions of the charger itself.BTHome EV Charger: Electrical Installation ChecklistWhat to check before installing an EV charger at home or in a building: dedicated circuit, overcurrent protection, grounding and the supply capacity.BTGrounding and Safety at EV Charging StationsWhy grounding decides the safety of an EV charging station: protective conductor, equipotential bonding, residual current device and continuity tests.BTElectric Vehicle: Battery, Onboard Charger and MotorHow an electric vehicle is built: traction battery, onboard charger, DC/DC converter, power electronics and motor, and what the charging point sees.BT/MTImpact of EV Charging on the Power GridHow EV charging affects transformers, feeders and the demand curve: continuous load, diversity, managed charging and the loading logic of IEC 60076-7.BT/MTHow to Size an EV Charging StationHow to size an EV charging station: power per point, diversity, load management, transformer, service cable and voltage drop, with a worked example.BTEV Charging Connectors: Type 1, Type 2, CCS, CHAdeMOWhich connectors EV charging uses: Type 1, Type 2, CCS, CHAdeMO and NACS, what each is for and why the choice matters when you specify a charger.BT/MTAC vs DC EV Charging: DifferencesWhat changes between charging an electric vehicle on AC and on DC: where the energy is converted, power levels, connectors and demands on the installation.BTLithium-Ion Batteries: Safety and Service LifeHow a lithium-ion battery ages, what shortens its life, how the BMS protects it and what risks it carries, for electric vehicles and energy storage.

Other topics in this section

WhatsApp