Tiza Group

Home / Guides / Grid, regulation and connection

Terminal Marking and Conductor Colours per IEC 60445

How IEC 60445 identifies terminals and conductors: blue for neutral, green-and-yellow for PE, L1 to L3, U, V, W and PEN, with their symbols and letters.

By Shadai García, CEO and protection engineer at Tiza Group.

L1brown1L2black2L3grey3Nblue4PEgreen-and-yellow5X1to 1~ loadsU1V1W1MM1PE to the frameWhat each mark meansL1, L2, L3: lines; black, brown and greyN: neutral, always bluePE: green-and-yellow, protection onlyU1-U2: odd and even at the endsFE: functional earth, never green-and-yellowThe project sets the colour orderMeansPositionColourSymbolLetters and numbers© tizagrp.comL1brown1L2black2L3grey3Nblue4PEgreen-and-yellow5X1to 1~ loadsU1V1W1MM1PE to the frameWhat each mark meansL1, L2, L3: lines; black, brown and greyN: neutral, always bluePE: green-and-yellow, protection onlyU1-U2: odd and even at the endsFE: functional earth, never green-and-yellowThe project sets the colour orderMeansPositionColourSymbolLetters and numbers© tizagrp.com
IEC 60445 identification: terminal strip X1 with L1, L2, L3, N and PE, motor terminals U1, V1 and W1 and what each mark means. Location in the system and operating principle. Illustrative: real values come from the nameplate and the manufacturer's manual.
Short answer

IEC 60445 sets how equipment terminals and conductors are identified, by position, colour, symbol or letters and numbers. The neutral is blue, the protective conductor is green-and-yellow and nothing else uses that combination. Conductors are marked L1, L2, L3, N and PE; equipment terminals U, V and W, with an odd and an even number at the ends of each element.

Short answer

IEC 60445 states how the terminals of a piece of equipment and the conductors that reach it are identified, so that nobody connects a phase where the neutral or the protective conductor belongs. There are four means: position, colour, graphical symbol, and letters and numbers. The neutral is identified by blue. The protective conductor is identified by green-and-yellow, and that combination is used for nothing else. Conductor letters are L1, L2, L3, N and PE; equipment terminal letters are U, V and W. The standard applies to resistors, fuses, relays, contactors, transformers, rotating machines and the assemblies that combine them (IEC 60445:2010, clause 1).

The four means of identification

Clause 4 of the standard allows a terminal or a conductor termination to be identified by one or more of these means:

  • Physical or relative position: the terminal on the left, the top one, the one closest to the incoming supply.
  • Colour, according to clause 6.
  • Graphical symbol, according to IEC 60417; if another one is needed, it must be consistent with IEC 60617.
  • Letters and numbers, according to clause 7.

The standard recommends letters and numbers because they keep the drawing, the terminal and the conductor consistent. The marking goes on the terminal or next to it (clause 5). If two means are used together and could be confused, the documentation must state how they correspond.

Identification by colour

The standard allows twelve colours for conductors: black, brown, red, orange, yellow, green, blue, violet, grey, white, pink and turquoise (clause 6.1). The colour goes at the terminations and, preferably, along the whole length, by the insulation or by markers. On bare bars it goes at the terminations and connection points.

What is reserved:

  • Neutral or mid-point: blue. An unsaturated blue, known as light blue, is recommended. Blue is not used for another conductor where confusion is possible. If the whole wiring system has no neutral, a blue conductor may have another use, but never as a protective conductor (clause 6.2.2).
  • Protective conductor: green-and-yellow. It is the only combination recognized for PE. On any 15 mm length, one of the two colours covers between 30 % and 70 % of the surface (clause 6.3.2).
  • Green and yellow on their own are used only where they cannot be confused with green-and-yellow, and they are not combined with other colours (clauses 6.2.1 and 6.3.1).
  • AC line conductors: the preferred colours are black, brown and grey. That order is alphabetical and does not set the phase sequence (clause 6.2.3).

The PEN conductor, which combines neutral and protection, is marked in one of two ways if insulated: green-and-yellow along its length with blue at the ends, or blue along its length with green-and-yellow at the ends. Each country chooses the method (clause 6.3.3).

Identification by letters and numbers

The general rules are in clause 7.1: upper-case Latin letters and Arabic numerals, without the letters I and O to avoid confusing them with 1 and 0, and with 6 and 9 underlined when they stand alone. The marking must contrast with the insulation colour and be legible and durable.

These are the designated-conductor markings that appear most often in a panel or switchgear (clause 7.3):

ConductorOn the conductorOn the equipment terminalColour
AC linesL1, L2, L3U, V, WBlack, brown, grey (preferred)
NeutralNNBlue
ProtectivePEPEGreen-and-yellow
Combined neutral and protectivePENPENGreen-and-yellow and blue
DC positive and negativeL+ and L−+ and −No recommendation
Functional earthFEFENo recommendation

Values from Table A.1 of IEC 60445:2010; wording and format by Tiza Group. The markings PEL, PEM, PB, PBE, PBU, FB and M complete the table in the standard.

How equipment terminals are numbered

Clause 7.2 gives four principles:

  1. The two ends of an element carry consecutive numbers, the odd one lower than the even one: 1 and 2.
  2. Intermediate points carry numbers higher than the ends, counted from the end with the lower number: 3 and 4.
  3. If several similar elements form a group, a letter is placed in front, such as U, V and W for the phases, or a number separated by a full stop, such as 1.1 and 1.2, when there is no phase to identify. Terminal blocks are numbered in numerical order.
  4. If there are several groups with the same letters, a number is placed in front of the letter.

The numbering of contactor and relay contacts, such as 13-14 or A1-A2, comes from the standards for those devices and is explained in contactor and relay terminal numbering.

Example: a motor in a 440 V panel

A panel feeds a three-phase motor with six terminals. Under the standard, each winding has its two ends with an odd and an even number: U1-U2, V1-V2 and W1-W2. The conductors coming from the panel are marked L1, L2 and L3, and the protective conductor PE, in green-and-yellow, goes to the earth terminal on the frame.

The project defines L1 as brown, L2 as black and L3 as grey, and writes it in the drawing legend. The standard allows that order or another; good practice requires that it be the same throughout the panel and the whole plant. At commissioning, we check that each conductor reaches the terminal the drawing shows, that the PE is continuous and that the direction of rotation is the expected one. PE continuity inside the panel is covered in panel PE circuit.

Protective earth or functional earth

The standard separates two uses of earthing (clause 5). Protective earthing protects people against electric shock. Functional earthing serves the operation of the equipment, for example electromagnetic compatibility. If a terminal fulfils both functions, it is marked as protective. If a functional earth does not meet the protective requirements, it is not marked PE nor coloured green-and-yellow: it is marked FE.

Local wiring codes may set their own colour code, and where they apply they govern the installation. We follow the code and the client requirements of each site.

Typical mistakes

  • Using a green-and-yellow wire as a phase or as a functional earth because it was the one in stock.
  • Thinking that black, brown and grey set the L1, L2, L3 sequence. The project defines the sequence.
  • Using blue as a phase in a circuit that does have a neutral.
  • Marking 6 and 9 without underlining on terminal strips that are read upside down.
  • Changing a colour or a marking on site without updating the drawing, as the guide on industrial electrical diagrams explains.

When to call us

When commissioning panels and switchgear, our team checks that terminal and conductor marking matches the drawings, that the PE is continuous and that each circuit lands where it should, as part of electrical panel commissioning. Field work is done in Colombia, or elsewhere on request. See our testing and commissioning service and write to us: we will send you a quote for the review.

References

  • IEC 60445, Basic and safety principles for man-machine interface, marking and identification - Identification of equipment terminals, conductor terminations and conductors, edition 5.0 (2010), clauses 1, 4, 5, 6.1, 6.2.1 to 6.2.3, 6.3.1 to 6.3.3, 7.1, 7.2, 7.3 and Table A.1.
  • IEC 60445, edition 7.0 (2021) with Amendment 1 (2026), current edition.

Frequently asked questions

Does IEC 60445 say which colour each phase gets?

It does not assign a colour to each phase. It states that the preferred colours for AC line conductors are black, brown and grey, and that this order is alphabetical and does not define the phase sequence or the direction of rotation (IEC 60445:2010, clause 6.2.3). The project must state which colour is L1, L2 and L3 and keep it throughout the installation.

Can I use a green-and-yellow wire as a functional earth?

No. Green-and-yellow is reserved for conductors with a protective function: PE, PEN, PEL, PEM and protective bonding conductors. A functional earthing conductor is marked FE and carries neither green-and-yellow nor the protective earth symbol (clauses 5 and 6.3.1 and note h of Table A.1).

How is a PEN conductor marked?

If insulated, there are two options: green-and-yellow along its whole length with blue markings at the terminations, or blue along its whole length with green-and-yellow markings at the terminations. Each country chooses the method, not each installer, and the alphanumeric identification is PEN (clauses 6.3.3 and 7.3.4).

WhatsApp