A panel quotation is only useful if it states clearly what is delivered: rated characteristics, devices, enclosure, documents, tests, certificates, lead time and warranty. Asking for that scope in writing lets you compare offers and avoids the open items that later become overruns.
A good panel quotation is a draft contract: it says what is delivered, with what characteristics and with what tests. If it is requested with the right information, offers can be compared; if not, you compare the prices of different things.
Short answer
In a panel quotation, request in writing: the rated characteristics (voltage, current, short circuit, IP and IK), the device list with references, the enclosure, the drawings and documents, the factory tests, the lead time, transport and the warranty. Whatever is not written remains an assumption of the one quoting.
What each section must say
| Section | What it must say | Warning sign |
|---|---|---|
| Standard and type | The IEC 61439 part that applies and the type of panel | Only «complies with IEC 61439» |
| Rated characteristics | Un, InA, Icw, Ipk, frequency, form of separation, IP and IK | Missing values or «as per catalog» |
| Devices | Make, reference, breaking capacity and quantity | «First brand» with no references |
| Enclosure | Material, thickness, finish, IP, dimensions | No dimensions or finish |
| Spare capacity | Spaces prepared and equipped for growth | Not mentioned |
| Engineering | Calculation report, drawings, bill of materials | «Drawings to be agreed» |
| Tests | Routine verification at the factory and protocol | Tests «optional» |
| Delivery | Lead time, transport, lifting and terms | No date or responsible party |
| Warranty and support | Duration, coverage and response | No written terms |
The normative basis of each row is in standards for LV switchboards; the input data to ask well, in data to specify a low-voltage switchboard.
The documents to receive
On delivery, the file should bring:
- As-built drawings: single-line, control, front and terminals.
- Bill of materials with references and quantities.
- The routine verification record of its unit.
- Assembly nameplate with the rated data.
- Operation and maintenance instructions.
Field tests on receipt are covered in commissioning of electrical panels and MCCs.
- Client: Request with written scope. Data, loads, network and site
- Supplier: Quotation with characteristics and devices. With references
- Client: Is every section of the table covered? Yes: continue; No: back to step 2.
- Client: Clarification of assumptions and exclusions. All in writing
- Client: Acceptance with closed scope. No open items
Worked example: asking for spare capacity and currents
A 480 V main board fed by an 800 kVA transformer with 5.75% impedance (an assumed value) has twelve outgoing ways today:
- Transformer rated current: 800 kVA / (√3 × 0.48 kV) = 962 A. Incomer and busbars are requested at 1,000 A or more.
- Prospective short circuit, infinite source: 962 / 0.0575 = 16.7 kA. Between 10 and 20 kA, clause 9.3.3 of IEC 61439-1 uses n = 2.0, so the prospective peak is 16.7 × 2 = 33.5 kA. The quotation must declare an Icw at least 16.7 kA and an Ipk at least 33.5 kA.
- 25% spare on twelve ways: 12 × 1.25 = 15 positions. That leaves three spare spaces. It must be written whether those three are only prepared (with busbars and supports) or also equipped with their breaker.
An offer that says «1,000 A panel» without declaring the two short-circuit values does not answer the question that matters.
Checklist to request the quotation
- Type of panel and the IEC 61439 part that applies.
- Voltage, frequency, earthing system and prospective short-circuit current.
- Load list, with starting method and growth reserve.
- Environment: indoor or outdoor, temperature, humidity, corrosion and altitude.
- Network operator requirements, if the panel includes metering.
- Documents and tests required on delivery.
- Lead time, place of delivery and who transports and lifts.
- Warranty terms.
What not to do
- Do not ask for «the best panel» or «the cheapest»: ask for a scope.
- Do not accept hidden assumptions: an offer with unwritten exclusions leaves them with you.
- Do not close without knowing who answers for the design: the original manufacturer or the assembler.
- Do not leave growth capacity as a verbal promise.
- Do not drop the factory tests to win lead time.
How we help
Our engineering team writes the scope and the specification you send for quotation, and reviews the offers you receive against this list: see engineering design or contact us.
Related guides
- Electrical panel price: what drives the cost
- Standards for LV switchboards: what applies and when
- Types of electrical panels: how to choose by load
- Data to specify a low-voltage switchboard
- Routine verification of a low-voltage switchboard
- Commissioning of electrical panels and MCCs: tests
- How to Specify an LV Switchboard Before Ordering
- Certified Switchboard: What Certification Proves
- Switchboard Lead Time: What Drives Delivery
References
- IEC 61439-1, edition 2020: user information (Annex C), design verification (clause 10) and routine verification (clause 11), clause 9.3.3 and Table 7 for the factor n.
Frequently asked questions
What must an electrical panel quotation include?
The rated characteristics (voltage, current, short circuit, IP and IK), the device list with make and reference, the enclosure, the engineering documents, the factory tests, the verification records, the lead time, transport and the warranty.
Which documents should the supplier deliver with the panel?
The as-built drawings, the bill of materials, the routine verification record, operation and maintenance instructions and the assembly nameplate. If the contract asks for it, also the design verification report.
How do I know if a panel quotation is incomplete?
If it does not cite the IEC 61439 part that applies, does not declare the short-circuit rating, says «first-brand devices» without references or leaves items «to be agreed», it lacks scope and cannot be compared.