Tiza Group

Home / Guides / Codes and grid connection: US, UK, CA, AU

Neutral Voltage Displacement Protection in Australia

How NVD protection and anti-islanding work for solar plants on Australian networks: 3V0 from open-delta VTs, rate of change limits and a worked example.

By Shadai García, CEO and protection engineer at Tiza Group.

network 22 kVnetwork breaker59N relay3V0 inputtransfer tripplant breaker=~HV windingunearthedPowerMeasure / tripCommssolid fault: 3 x 12.70 = 38.1 kV, relay sees 110 Vsetting 20%: 0.20 x 110 = 22 V3wC = 1.131e-3 S; 3wC x Rf = 4.899detects an earth fault up to 4,330 ohm1.0 + 0.05 + 0.08 = 1.13 s, dead time 3.0 sRf (ohm)%02,0004,0006,0008,00002050100neutral shiftsetting 20%4,330plant disconnects1.13 sdead time 3.0 sillustrative; the distributor sets the delayChainVT star primaryOpen delta3V059N relayPlant trip© tizagrp.comnetwork 22 kVnetwork breaker59N relay3V0 inputtransfer tripplant breaker=~HV windingunearthedPowerMeasure / tripCommssolid fault: 3 x 12.70 = 38.1 kV, relay sees 110 Vsetting 20%: 0.20 x 110 = 22 V3wC = 1.131e-3 S; 3wC x Rf = 4.899detects an earth fault up to 4,330 ohm1.0 + 0.05 + 0.08 = 1.13 s, dead time 3.0 sRf (ohm)%02,0004,0006,0008,00002050100neutral shiftsetting 20%4,330plant disconnects1.13 sdead time 3.0 sillustrative; the distributor sets the delayChainVT star primaryOpen delta3V059N relayPlant trip© tizagrp.com
Neutral voltage displacement protection: three voltage transformers with primaries in star to earth and secondaries in open delta feeding the 3V0 input of the NVD relay, which trips the plant breaker after the network breaker opens on an earth fault, with a transfer trip link, and the 20 percent setting that detects earth faults up to 4,330 ohm. Location in the system and operating principle. Illustrative: real values come from the nameplate and the manufacturer's manual.
Short answer

Neutral voltage displacement (NVD) protection detects an earth fault on the network side by measuring the residual voltage, 3V0, across the open-delta winding of the voltage transformers. It works when the plant's high voltage winding has no earth reference, so a fault that persists after the network breaker opens shifts the neutral. Anti-islanding is the wider duty of disconnecting a plant that has lost the grid. The National Electricity Rules let AEMO or the network provider require a local or remote scheme for it.

When a distribution feeder loses its connection to the grid, a solar plant can keep a small section of network energised. That section is an island. Two duties prevent it: neutral voltage displacement (NVD) protection, which detects earth faults that outlive the network breaker, and anti-islanding in general. NVD measures the residual voltage, 3V0, with voltage transformers (VTs) in open delta. The National Electricity Rules (NER) and the distributors set when each is required. The wider framework is in the Australian electrical codes and grid connection guide.

Short answer

NVD protection (ANSI 59N) measures the residual voltage at the point of connection. It operates when an earth fault shifts the neutral of a part of the network that has no earth reference. That happens when the network breaker has opened for an earth fault but the plant keeps feeding the faulted feeder. The plant transformer has an unearthed high voltage winding. In that situation no earth fault current flows from the plant, so overcurrent elements stay quiet. The residual voltage is the signal.

Distributors set when it is required. In Western Australia, Western Power’s Technical Rules clause 3.6.10.1(g) includes NVD protection for earth faults on the distribution system. A conditional exemption notice, issued in 2021, lifts it for an inverter system at a low voltage connection point that meets conditions: inverters certified to IEC 62116, and rate of change of frequency protection set at 4 Hz/s. The exemption covers only earth faults on the distribution side. The installation still needs earth fault protection on its own network.

How 3V0 is measured

Three single-phase VTs have their primaries connected phase to earth, with the neutral earthed. Their secondaries each have a residual winding, and those windings are connected in series as an open delta. The relay sits across the open corner. In normal operation the three voltages add to zero. During an earth fault they add to 3V0, three times the zero-sequence voltage. The details of the winding are in the open-delta residual voltage winding and the protection function in neutral overvoltage 59N.

On an isolated system with a solid earth fault, the neutral shifts by the full phase voltage. With a VT whose residual winding is rated 110/3 V per phase, the relay then sees 110 V. A fault through resistance gives less. How far the neutral shifts depends on the fault resistance and on the capacitance of the island to earth.

If the plant’s high voltage winding is effectively earthed, the neutral cannot shift, and NVD does not work. The earth fault is then detected with earth overcurrent elements instead. The earthing of the plant transformer is therefore a design decision to agree with the distributor. See neutral voltage unbalance in an ungrounded wye bank for the same effect on an ungrounded bank.

Anti-islanding in the NEM

Clause S5.2.5.8 of the NER lets AEMO or the network service provider (NSP) add a requirement to the performance standard. The plant must disconnect automatically, by a local or remote control scheme, whenever its part of the network has separated from the national grid and supplies load. A remote scheme is typically a transfer trip from the network breaker.

Two limits shape what the plant’s own relays can do:

  • Vector shift protection, or a similar function, must not operate for voltage phase angle changes below 20 degrees at the connection point.
  • Under S5.2.5.3, a plant at the automatic access standard stays in continuous operation. The exception is a rate of change of frequency beyond plus or minus 4 Hz/s for 0.25 s, or beyond plus or minus 3 Hz/s for 1 s.

A rate of change relay set inside those ranges would trip the plant for events it must ride through, unless the performance standard records that condition. For small inverter systems, the inverter itself provides the anti-islanding function. AS/NZS 4777.2:2020, with Amendment 2:2024, sets that behaviour, and IEC 62116 is the test procedure distributors refer to.

Worked example: sensitivity of the NVD relay

These values are illustrative. A solar farm connects at 22 kV through a transformer with an unearthed high voltage winding. The islanded 22 kV network section has a capacitance to earth of 1.2 microfarad per phase, at 50 Hz.

  1. Phase voltage: 22,000 ÷ √3 = 12.70 kV. The residual voltage for a solid earth fault is 3 × 12.70 = 38.1 kV.
  2. The VTs have a primary of 22 kV ÷ √3 = 12.70 kV and a residual winding rated 110 V ÷ 3 = 36.67 V. The ratio is 12,702 ÷ 36.67 = 346.4, so the relay sees 38,105 ÷ 346.4 = 110 V for a solid fault.
  3. Setting: 20% of full displacement is 0.20 × 110 = 22 V, equal to a neutral shift of 20% of the phase voltage.
  4. The neutral shift for a fault resistance Rf is the phase voltage ÷ √(1 + (3 × ω × C × Rf)²). Here ω = 2π × 50 = 314.2 rad/s and C = 1.2 × 10⁻⁶ F, so 3ωC = 1.131 × 10⁻³ S.
  5. Setting the shift at 20%: (3ωCRf)² = 1 ÷ 0.2² − 1 = 24, so 3ωCRf = 4.899 and Rf = 4.899 ÷ 1.131 × 10⁻³ = 4,330 ohm.

The relay detects an earth fault of up to about 4.3 kohm in the island. A lower setting detects higher fault resistance, but must stay above the standing residual voltage from VT errors and system unbalance. With a time delay of 1.0 s, a relay time of 0.05 s and a breaker time of 0.08 s, the plant disconnects in 1.13 s. That is inside an assumed 3.0 s reclose dead time. The real delay and dead time come from the distributor.

Figure: connection of three voltage transformers in open delta to an NVD relay at the point of connection, with the plant transformer and the network breaker.

Checklist for the engineer

  • Ask the distributor or NSP whether NVD, a transfer trip or both are required, and in which edition of its document.
  • Confirm the earthing of the plant transformer’s high voltage winding and the network source.
  • Specify VTs with a residual winding suitable for the NVD relay, and confirm the ratio.
  • Measure the standing residual voltage at commissioning and set the pickup above it.
  • Coordinate the time delay with the network’s earth fault protection and reclosing.
  • Check that rate of change and vector shift settings respect the ride-through limits above.
  • Test the transfer trip end to end, including the communications.

Who certifies

Engineer registration is a state matter in Australia. In Queensland, professional engineering services must be provided by, or under the direct supervision of, a Registered Professional Engineer of Queensland (RPEQ). Your RPEQ (in Queensland) or chartered engineer reviews and certifies the protection design and settings. Tiza does not stamp, sign or certify.

For protection at the point of connection, see solar protection settings at the PCC. For islands and rate of change of frequency, see cogeneration and the grid: checks if the plant islands and rate of change of frequency 81R. The connection routes are in embedded generation connection by DNSP.

How Tiza can help

If your project needs a protection settings study and the relay configuration for NVD and anti-islanding, Tiza prepares them remotely and in English. Tiza delivers engineering ready for your RPEQ (in Queensland) or chartered engineer to review and certify, and does not stamp, sign or certify itself. Contact us with the distributor’s requirements and the relay model.

Frequently asked questions

What does NVD protection detect?

It detects an earth fault on the network side of a plant that has no earth reference on its high voltage winding. The fault shifts the neutral, and the three voltage transformers connected in open delta give a residual voltage, 3V0, to the relay. The relay trips the plant so that it does not keep a faulted section of the network energised.

Is NVD the same as anti-islanding?

No. NVD detects one cause of an island, an earth fault that stays energised after the network breaker opens. Anti-islanding is the wider duty to disconnect when the plant has lost the grid for any reason. It uses voltage and frequency limits, inverter detection methods and, for larger plants, a transfer trip from the network breaker.

Can a rate of change of frequency relay be set sensitive enough to detect islands in the NEM?

Not without conflict. Under clause S5.2.5.3 a plant at the automatic access standard must stay connected unless the rate of change of frequency leaves a range of plus or minus 4 Hz/s for 0.25 s or plus or minus 3 Hz/s for 1 s. A relay set tighter would trip the plant for events it must ride through, unless the performance standard records that condition.

WhatsApp