Tiza Group

Home / Guides / Studies and design

Harmonics of 6, 12 and 24-Pulse Rectifiers

Why a 12 or 24-pulse rectifier removes the 6-pulse harmonics: the order h = k·q ± 1, transformer phase shift and a worked example with figures.

By Shadai García, CEO and protection engineer at Tiza Group.

480 V network52~=Y, 0°~=Δ, 30°two 6-pulse bridges in parallelAB5th harmonic:A + B = 0primary currents% of fundamental (ideal 100 / h)57111317192325h6 pulses12 pulses24 pulses6 pulses: 5, 7, 11, 13; THD 30.0 %12 pulses: THD 14.2 % (14.4 % with 55/45)24 pulses: 23, 25, 47, 49; THD 6.6 %ChainGridPhase-shifting transformer6-pulse bridgesOrder h = k·q ± 1© tizagrp.com480 V network52~=Y, 0°~=Δ, 30°two 6-pulse bridges in parallelAB5th harmonic:A + B = 0primary currents% of fundamental (ideal 100 / h)57111317192325h6 pulses12 pulses24 pulses6 pulses: 5, 7, 11, 13; THD 30.0 %12 pulses: THD 14.2 % (14.4 % with 55/45)24 pulses: 23, 25, 47, 49; THD 6.6 %ChainGridPhase-shifting transformer6-pulse bridgesOrder h = k·q ± 1© tizagrp.com
6-, 12- and 24-pulse rectifiers: two bridges with secondaries shifted 30° cancel the 5th and 7th harmonics, and with 24 pulses only the 23rd and 25th remain. Location in the system and operating principle. Illustrative: real values come from the nameplate and the manufacturer's manual.
Short answer

A q-pulse rectifier produces current harmonics of order h = k·q ± 1, with an ideal amplitude of 1/h of the fundamental. With 6 pulses the 5th, 7th, 11th and 13th appear; with 12 pulses, shifting two bridges by 30°, the 5th and 7th cancel; with 24 pulses, shifting four bridges by 15°, only the 23rd and 25th remain. The cancellation requires the bridges to share the load equally.

Short answer

A q-pulse rectifier produces current harmonics of order h = k·q ± 1 in the network, with k = 1, 2, 3… and, in the ideal case, an amplitude equal to 1/h of the fundamental current. With 6 pulses the harmonics 5, 7, 11, 13, 17, 19 and higher appear. With 12 pulses the 5th and 7th disappear, leaving 11, 13, 23 and 25. With 24 pulses, 23, 25, 47 and 49 remain.

The cancellation is achieved with the transformer: each 6-pulse bridge is fed with a voltage shifted with respect to the other, and the low-order harmonics reach the network in opposite phase. It is a passive method, with no filters or control, based on the transformer, but it depends on the bridges carrying equal load. Current harmonic limits depend on the ratio between short-circuit current and load current: see the harmonic study with IEEE 519.

Why a 6-pulse rectifier generates harmonics

A diode or thyristor bridge rectifier draws current from the network only during part of the cycle, in pulses. A current like that is not sinusoidal. Its analysis into components gives the fundamental plus harmonics of order h = k·q ± 1 with q = 6: the 5th and 7th have the highest amplitude, then the 11th and 13th, and so on up to high orders. The frequency of each harmonic is its order times the network frequency: on a 60 Hz system, the 5th is at 300 Hz.

Harmonics of order 3 and its multiples do not appear in a balanced three-phase 6-pulse bridge. 6-pulse rectifiers are used by variable frequency drives, chargers, rectifier-fed furnaces and the input stage of industrial power supplies. For the drive case, see harmonics of variable frequency drives.

How 12 and 24 pulses cancel them

12 pulses. Two 6-pulse bridges are connected in parallel (or in series) and fed from a transformer with two secondaries shifted 30°, normally one wye and one delta. The 5th and 7th harmonics of one bridge arrive at the primary in opposite phase to those of the other, and cancel. The 11th and 13th, on the other hand, arrive in phase and add up. The network current ends up with 12 steps per cycle instead of 6.

24 pulses. Four bridges fed with voltages shifted 15° from each other, for example with two 12-pulse transformers shifted 15° between them. Besides the 5th and 7th, the 11th and 13th are cancelled, leaving the 23rd and 25th.

18 pulses (bridges shifted 20°): the 17th and 19th remain, and then the 35th and 37th. The principle is the same: the more bridges and the smaller the shift, the higher the order and the lower the amplitude of the first harmonic that survives.

Worked example

Example data (assumed values, not measured): rectified load of 1 000 kVA at 480 V three-phase. Input fundamental current: I₁ = 1 000 / (√3 × 0.48) = 1 202.8 A. The ideal amplitudes 1/h are used (in real equipment they are somewhat lower, because of commutation reactance and the inductance on the direct-current side, so they are an upper reference).

1. 6-pulse rectifier. Harmonics 5, 7, 11 and 13: I₅ = 1 202.8 / 5 = 240.6 A; I₇ = 171.8 A; I₁₁ = 109.3 A; I₁₃ = 92.5 A.

2. Total distortion. Adding 1/h² for the characteristic orders up to the 49th, THD = √Σ(1/h²) = 30.0 % of the fundamental.

3. Ideal 12-pulse rectifier. The orders are 11, 13, 23, 25, 35, 37, 47 and 49: I₁₁ = 109.3 A; I₁₃ = 92.5 A; I₂₃ = 52.3 A; I₂₅ = 48.1 A. The 5th and 7th disappear. THD up to the 49th: 14.2 %, less than half of the 6-pulse value.

4. Ideal 24-pulse rectifier. I₂₃ = 52.3 A, I₂₅ = 48.1 A and orders 47 and 49 remain. THD up to the 49th: 6.6 %.

5. Effect of an unequal split in 12 pulses. If bridge A takes 55 % of the current (661.5 A) and B takes 45 % (541.3 A), the difference is 120.2 A. The residual 5th is 120.2 / 5 = 24.1 A and the residual 7th is 120.2 / 7 = 17.2 A, equal to 2.0 % and 1.4 % of I₁. THD goes from 14.2 % to 14.4 %.

Order6 pulses (A)Ideal 12 pulses (A)12 pulses, 55/45 split (A)Ideal 24 pulses (A)
5240.6024.10
7171.8017.20
11109.3109.3109.30
1392.592.592.50
23052.352.352.3
25048.148.148.1

For the limit current, the correction by pulse number appears in the limit multipliers by number of pulses in IEEE 519.

What is gained and what it costs

  • Advantage. Distortion is removed or greatly reduced without filters or active converters, and heating of transformers and conductors from harmonics drops.
  • Cost. It requires a transformer with two or more secondaries, more bridges and more space. The cancellation holds only if the bridges share the load and the secondary impedances are equal.
  • Limitation. With a single bridge in service the cancellation is lost completely; with voltage or impedance unbalance it is partial, and the 5th and 7th harmonics reappear.
  • Alternatives. Tuned passive filters, see the tuned harmonic filter, or active filters, see active versus passive filter.

Mistakes to avoid

  • Counting the pulses of the drive without confirming the real phase shift of the input transformer.
  • Assuming the 5th and 7th are cancelled without checking load sharing and impedances.
  • Forgetting that the 11th and 13th add up in 12 pulses and still count in the study.
  • Using the 1/h values as measured: they are an ideal reference.
  • Evaluating distortion at the equipment and not at the point of common coupling with the network.

Checklist

  • Real number of pulses of each rectifier, confirmed with the transformer diagram.
  • Phase shift between secondaries verified.
  • Load sharing between bridges and secondary impedances reviewed.
  • Characteristic and residual harmonics estimated.
  • Resonance with capacitor banks reviewed.
  • Distortion evaluated at the point of common coupling.
  • Measurement in operation at partial load and at full load.

References

  • Calculations and data: our own, with assumed data for the example.

Need this study?

The harmonic study of your plant, with the selection of the number of pulses, the transformer, the review of resonances and compliance with the limits, is part of our engineering design and studies service. We do it for projects in any country. Write to us.

Frequently asked questions

How do you calculate which harmonics a rectifier generates?

With the formula h = k·q ± 1, where q is the number of pulses and k is 1, 2, 3... A 6-pulse rectifier generates orders 5, 7, 11, 13, 17, 19; a 12-pulse one, orders 11, 13, 23, 25; a 24-pulse one, orders 23, 25, 47, 49. In the ideal case, each harmonic has an amplitude of 1/h of the fundamental current.

Why do harmonics cancel in a 12-pulse rectifier?

Because two 6-pulse bridges are fed with voltages shifted 30° from each other, for example with one wye winding and one delta winding. The 5th and 7th harmonics of one bridge end up in opposite phase to those of the other and cancel on the network side. The 11th and 13th are in phase in both bridges and add up.

What happens if the two bridges do not carry the same load?

The cancellation is incomplete: a residual harmonic remains, proportional to the difference between the currents of the two bridges. In the worked example, with a 55 % and 45 % split, the residual 5th harmonic is 2 % of the fundamental current. Impedance differences between the two secondaries and network voltage unbalance also matter.

WhatsApp