Section 4 of the Canadian Electrical Code (CSA C22.1) sets conductor ampacity. Rule 4-004 points to the ampacity table by material and installation method, Rule 4-006 limits the result by the temperature rating of the terminations, and correction factors apply for ambient temperature and for more than three current-carrying conductors. Section 8 then limits continuous loads to a share of that ampacity.
Short answer: how the CEC sizes a conductor
In the Canadian Electrical Code (CEC, CSA C22.1), Section 4 gives the ampacity of a conductor. Four steps lead to the size.
- Pick the table. Rule 4-004 points to the table that fits the conductor material and the installation method.
- Limit by the termination. Rule 4-006 limits the result to the column that matches the temperature rating of the equipment terminals.
- Apply correction factors. Ambient temperature and the number of current-carrying conductors in a raceway or cable reduce the ampacity.
- Check the load. Section 8 compares the load with the corrected ampacity, with a lower limit for continuous loads.
The ampacity, the load and the overcurrent device must all agree. The device rules sit in Section 14. The framework for all the Canadian rules is in the overview of electrical codes and grid connection in Canada. Adoption is provincial, so confirm the edition in force; the current national edition is CSA C22.1:24.
Step 1: choose the table with Rule 4-004
Rule 4-004 does not give an ampacity. It sends you to the table that applies. In general, one table covers copper conductors in a raceway or cable, another covers aluminum in the same installation, and further tables cover conductors in free air. Check the table heading for the maximum number of conductors it assumes and for the voltage range.
Choosing the wrong table is the most frequent error. A design copied from a different jurisdiction may use a table with a different basis. A CEC design needs the CEC table, in the edition adopted where the project is built, taken from a licensed copy of the Code.
Step 2: the termination limit in Rule 4-006
Breakers, fuses, lugs and terminal blocks have a maximum conductor temperature rating, marked on the equipment. Rule 4-006 limits the ampacity to the table column that matches that marking, even when the conductor insulation is rated higher. Where the equipment is not marked, the Code assumes a default rating that depends on the size of the equipment.
This is why an insulation rating of 90 °C does not mean the 90 °C column sets the size. The 90 °C value is useful as a starting point before correction factors, because the corrections can then be applied to a larger number. The final ampacity cannot exceed the termination column. The same principle exists in US practice under NEC 110.14(C); see CEC versus NEC.
Step 3: correction factors
The table values assume a stated ambient temperature and no more than three current-carrying conductors. When the site differs, the Code gives correction factors. Two matter most.
- Ambient temperature. A hot location such as a rooftop, an attic or a boiler room lowers the ampacity.
- Grouping. More than three current-carrying conductors in one raceway or cable lowers the ampacity, with a larger reduction for larger groups.
These are the same physical effects explained in ampacity adjustment factors for temperature, soil and grouping. Apply the corrections to the value that the table gives for the conductor insulation, then compare the result with the termination limit and keep the lower of the two. A neutral that carries harmonic current may count as a current-carrying conductor; the rules for that belong to the edition you apply.
Step 4: the continuous load check in Section 8
The corrected ampacity is not the end. Rule 8-104 treats a load as continuous when it lasts beyond stated time limits, and it limits a continuous load to a share of the ampacity. The usual share is 80% when the overcurrent device is not marked for 100% continuous operation. A device marked for 100% allows a higher share. A single conductor in free air has a lower share than a conductor in a raceway.
The 80% limit is the Canadian way of writing the 125% factor of US practice. For a load of 48 A, both give a minimum of 60 A for the circuit rating, because 48 ÷ 0.8 = 60 and 48 × 1.25 = 60.
Worked example: feeder to a continuous load
The numbers are illustrative. The ampacity values are assumed for the example and are not taken from the Code tables.
Assumptions
- Three-phase, 600 V, 40 kW continuous load at unity power factor.
- Six current-carrying conductors in one raceway, with a correction factor of 0.80 assumed for the example.
- Terminations rated 75 °C. Three candidate conductors have assumed 75 °C table ampacities of 50 A, 65 A and 85 A.
Step 1: load current. I = 40 000 ÷ (√3 × 600) = 38.5 A.
Step 2: required corrected ampacity. A continuous load may use 80% of the ampacity, so the corrected ampacity must be at least 38.5 ÷ 0.8 = 48.1 A.
Step 3: required table ampacity. The correction factor of 0.80 reduces the table value, so the table ampacity must be at least 48.1 ÷ 0.8 = 60.1 A.
Step 4: select the conductor. The 50 A candidate fails. The 65 A candidate passes, because 65 × 0.80 = 52.0 A, which is above 48.1 A.
Step 5: check the device. The device may not exceed the corrected ampacity of 52 A, and for a continuous load it may not be below 38.5 ÷ 0.8 = 48.1 A. A 50 A device fits between the two limits.
Step 6: check voltage drop. Size and protection are only part of the design. AC cable voltage drop shows how to check the length of the run.
If the installation had only three conductors, the 50 A candidate would pass the table step: 50 A corrected ampacity ≥ 48.1 A. The grouping alone moves the design up one size.
Solar and generation circuits
PV and storage circuits add their own rules in Section 64, including factors for the maximum circuit current that are not the same as for ordinary loads. Use the Section 64 rules for the DC side and the Section 4 and Section 8 rules for the AC side. For the string side, see PV string sizing and cable and raceway sizing in PV systems.
Common mistakes
- Using the 90 °C column for sizing when the terminations are rated lower.
- Using a table for a different material or installation method.
- Applying the grouping factor to the wrong number of conductors.
- Treating a continuous load as a normal load and skipping the 80% check.
- Reusing a US ampacity schedule without checking the Canadian tables.
Checklist for the engineer
- Confirm the CSA C22.1 edition and the provincial amendments at permit date.
- Identify the table from Rule 4-004 for each conductor and installation.
- Read the temperature marking on each termination.
- Apply ambient and grouping corrections.
- Keep the lower of the corrected insulation ampacity and the termination limit.
- Check continuous loads against the Section 8 limit.
- Compare the result with the overcurrent device and the voltage drop.
- Keep the package ready for the engineer of record to review and stamp.
Related guides
Next in the chain: CEC Section 86 for electric vehicle charging. For the international view, see the four wiring codes compared.
From the rules to a design your engineer can stamp
Electrical engineering in Canada is sealed by a professional engineer (P.Eng.) licensed in the province or territory of the project. Tiza does not stamp, sign or certify designs. We prepare the engineering design: cable schedules, ampacity and voltage-drop calculations and protection schedules, ready for your P.Eng. to review and stamp. Contact us to scope the package.
Frequently asked questions
Which table gives the ampacity of a conductor in the CEC?
Rule 4-004 points to the table that matches the conductor material and the way it is installed. Copper in a raceway or cable and aluminum in the same installation use different tables, and free-air installations use others. The table gives a base value that the correction factors then adjust.
Why can a 90 °C conductor not be used at its 90 °C ampacity?
Because the equipment it connects to has its own temperature rating. Rule 4-006 limits the ampacity to the column that matches the termination rating. A 90 °C conductor is therefore usually sized from a lower column at a breaker, and its 90 °C value is useful only as a starting point for correction factors.
Does the 80% continuous load rule belong to Section 4?
No, it belongs to Section 8. Section 4 gives the ampacity of the conductor. Section 8 (Rule 8-104) then limits a continuous load to a share of that ampacity, normally 80% when the overcurrent device is not marked for 100% continuous operation.